200 Amp upgrades, Federal Pacific & Zinsco replacements, sub-panels, and full panel modernization by licensed electricians.
Panel work isn't a side service we do between bigger jobs. It's the most consequential single project in residential electrical service, and we handle every phase of it ourselves — load calculation, utility coordination, permit pull, install, inspection scheduling, post-energization verification, and documentation. No subcontracting. No hand-offs to a panel specialist who's only available three weeks out.
Our crews are cross-trained on panel work specifically because the panel touches every other job we run, and we wanted to be the contractor that handles it end-to-end.
Full service upgrade including meter base, service entrance conductors, and panel. Load calculation performed. Most jobs complete in one day.
Complete modernization with new cabinet, breakers, and properly labeled directory.
Critical safety upgrades. Insurance non-renewal issues resolved with documented replacement.
For additions, workshops, garages, EV chargers, and in-law suites. 60–125 amp common sizes.
Weather-exposed conductor replacement with full utility coordination.
Automatic transfer switch and load-shed integration for standby generators.
"Insurance non-renewal due to Federal Pacific panel. All Phases completed the upgrade in one day, inspection passed first try, and documentation was sent to the carrier within 48 hours."
— Adelaide Pemberton
"They performed a real load calculation. Sized for EV charger plus future heat pump. Install went smoothly and forward-thinking."
— Frederick Lindquist
"Labeling discrepancy found on inspection. They returned the next day at no charge and got it corrected quickly."
— Phyllis Donegan
Not sure if you need a full replacement or just a repair? Start with an honest diagnostic. We’ll tell you exactly what your panel needs.
Click Here to Call (888) 355-9624Most residential upgrades in Dallas complete in one full day on-site, plus an inspection window that varies with the local jurisdiction.
Yes, for the install window — typically the bulk of the work day. We coordinate timing so it’s predictable.
For Federal Pacific, Stab-Lok, or Zinsco replacements, most carriers require documented replacement. We provide all necessary paperwork.
Yes. A 200-amp panel typically supports a Level 2 EV charger comfortably. We size upgrades with future loads in mind.
Repair addresses a specific component. Replacement swaps the entire panel. The right choice depends on age, condition, and service life.